Chambers Truss

STANDARD RESPONSIBILITIES DOCUMENT, WTCA 1-1995

2.0 OWNER RESPONSIBILITIES

2.1 Directly or through its representatives, which may include the Contractor and/or Building Designer; (a) review and approve each Truss Design Drawing; (b) review and approve the Truss Placement Plan; (c) resolve and approve all design issues arising out of the preparation of each Truss Design Drawing and Truss Placement Plan; and (d) coordinate the return of each approved Truss Design Drawing and Truss Placement Plan to the Truss Manufacturer prior to truss manufacturing.

 

This material may not be reproduced without the written permission of the Wood Truss Council of America (WTCA). Contact WTCA at www.woodtruss.com.